 | A new 4.1km electrified track with bi-directional signalling from Robina to Varsity Lakes
 |
 | Construction of a new 300m long tunnel under Easthill Drive
 |
 | Construction of three new bridges on Investigator Drive, Robina Parkway and Scottsdale Drive
 |
 | Construction of two new over-rail line road bridges on Investigator Drive and Robina Parkway
 |
 | Construction of new rail station at Varsity Lakes which will feature 300 car parking spaces, 6 bus bays and a kiss’n’ride and taxi zone will allow pick up and drop of near the station
 |